Snake River Structural Elements
Home
Seattle Grant
Español
Contractors
Homeowners
About
Businesses
Ballistic Panels Idaho
FAQ
Snake River Structural Elements
Home
Seattle Grant
Español
Contractors
Homeowners
About
Businesses
Ballistic Panels Idaho
FAQ
More
  • Home
  • Seattle Grant
  • Español
  • Contractors
  • Homeowners
  • About
  • Businesses
  • Ballistic Panels Idaho
  • FAQ
  • Home
  • Seattle Grant
  • Español
  • Contractors
  • Homeowners
  • About
  • Businesses
  • Ballistic Panels Idaho
  • FAQ

Seattle Businesses: Up to $10,000 for Security

Start With Clear Protection Options

Seattle's Storefront Security Fund may reimburse eligible businesses for up to $10,000 in approved security improvements. Review these material options, then confirm eligibility with Seattle OED before purchasing.

Package 1 — Small Wall Area

$2,372

Three 4-by-8 Level 3 panels ($1,776), two estimated 8-foot joint battens ($96), and a $500 estimated customer-paid freight charge. Final freight is charged at the carrier’s actual cost.

Package 2 — Larger Wall Area

$4,932

Seven 4-by-8 Level 3 panels ($4,144), six estimated 8-foot joint battens ($288), and a $500 estimated customer-paid freight charge. Final freight is charged at the carrier’s actual cost.

Custom Project

Request Estimate

Choose this for a larger wall, counter, security desk, multiple areas, or a project that does not fit Package 1 or 2. Send measurements, plans, photos, and delivery information.


Level 3 or Level 7? Plain-Language Guide

LEVEL 3 — HANDGUN PROTECTION: Tested for powerful handgun threats, including .44 Magnum. Level 3 is not intended for AR-15 or other rifle threats. LEVEL 7 — 5.56 / COMMON AR-15 PROTECTION: Tested for multiple shots from specified 5.56 mm rifle ammunition—the caliber commonly used in many AR-15-style rifles. Protection depends on the tested ammunition, complete wall design, covered seams, and correct installation.

Reduced Price Protection

Through Nov. 5

Select Package 1 or 2 and receive a written estimate by November 5, 2026. SRE will protect the listed panel price while the grant application is reviewed, provided the project scope does not change.

What Do I Do Next?

Required Process

1. Apply for the fund. 2. Complete the required CPTED security assessment. 3. Confirm the materials are eligible and get City approval before buying. 4. Finalize the material and contractor quotes. 5. Complete and pay for the approved work; keep invoices, receipts, and photos. 6. Submit the reimbursement documents. SRE prepares the material estimate; the City decides eligibility and approval.

Estimated Lead Time

About 5 weeks

Material lead time is approximately five weeks after final specifications, delivery requirements, and payment arrangements are confirmed.

FREIGHT CLARIFICATION: The $500 previously described as a freight allowance is an estimated customer-paid freight charge included in the package total—not a credit, discount, reimbursement, or SRE-funded contribution. Freight is paid by the customer or included in the approved grant project. Final freight is charged at the carrier’s actual cost, and any difference will be disclosed and approved before the order is placed. Batten quantities depend on the final layout. Taxes, cutting, additional panels, perimeter battens, installation, and other project requirements are separate.

Send Project Details

Request a Package or Custom Estimate

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Questions Before You Submit?

Call 208-844-1654 or email info@snakeriverstructuralelements.com. We can help you identify the information needed for an estimate.

Snake River Structural Elements

2088441654

Know About a Security Grant?

Send Us the Grant

If you know of a city, state, tribal, or government-backed grant that may cover storefront or building-security improvements, send us the program name or link.

We’ll Help With the Details

SRE can review the program, contact the grant administrator about UL 752 panel eligibility, and provide panel information, pricing, specifications, and a project quote.

Approval Still Comes From the Agency

Grant approval is decided by the funding agency. SRE does not guarantee eligibility or act as a grant writer, contractor, engineer, or code authority.

  • Privacy Policy

Snake River Structural Elements

208-844-1654

Copyright © 2026 Snake River Structural Elements - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept